Sharing and Compatibility Studies between International Mobile Telecommunications Systems (Mobile Cellular) and Earth-Exploration Satellite Service (active) in 10-10.5 GHz

Heykel Houas
DOI: https://doi.org/10.48550/arXiv.2408.07074
2024-07-29
Abstract:The World Radiocommunications Conference 2023 (WRC-23), held in Dubai, intensively discussed several Agenda Items related to possible new International Mobile Telecommunications (IMT) identifications of several radio frequency bands. One example of a frequency band is 10-10.5 GHz, which has a primary allocation to Radiolocation, Earth-Exploration Satellite services. In order to ensure continued protection of such incumbent services, sharing and compatibility studies were conducted, and debated at length, at the ITU-R Study Groups from the year 2020 to 2023. This document presents a coexistence study. During the 41st Meeting of Permanent Consultative Committee II: Radiocommunications of the Inter American Telecommunication Commission (CITEL), one administration modified its previous Draft Inter-American Proposal, to include additional protection to the incumbent services (e.g., EESS (Active)). The same administration introduced three conditions meant to ensure protection of the incumbent services, in particular for the EESS (Active) and Radiolocation Service. Such conditions were: Administrations shall take practical measures to ensure the transmitting antennas of outdoor IMT base stations (BSs) are normally pointing below the true horizon when deployed within 10-10.5 GHz; additionally, the mechanical pointing needs to be at or below the horizon; Administrations shall use side lobe suppression techniques providing 29.5 dB of attenuation for elevation angles above 30 degrees where 0 degrees relates to the horizon and 90 degrees to the zenith, referenced to the maximum antenna gain at the boresight; The maximum equivalent isotropically radiated power (e.i.r.p.) emitted by an IMT base station shall not exceed 32 dB W/100 MHz.
Signal Processing
What problem does this paper attempt to address?
The problems that this paper attempts to solve are: within the 10 - 10.5 GHz frequency band, how to ensure the co - existence between the International Mobile Telecommunications (IMT) system and the existing Earth Exploration - Satellite Service (EESS, especially the active Synthetic Aperture Radar (SAR)), and avoid the introduction of the IMT system causing harmful interference to the existing radio services. Specifically, the research focuses on: 1. **Protecting the existing radio communication systems**: In particular, those radio communication systems used for scientific services, such as the Earth exploration satellites used for Synthetic Aperture Radar (SAR) operations. These systems operate in the 9.2 - 10.4 GHz frequency band (i.e., the X - band) and can provide higher spatial resolution, better sensitivity to small objects and reduced atmospheric attenuation, which are crucial for monitoring natural disaster events. 2. **Frequency sharing and compatibility research**: In order to ensure that when the 10 - 10.5 GHz frequency band may be allocated to the IMT system at the WRC - 23 conference, it will not have an adverse impact on the existing Earth exploration - satellite services (such as EESS (Active) and radio - location services), detailed sharing and compatibility research has been carried out. 3. **Proposing protection measures**: In order to protect the existing radio services, three conditions are proposed: - **Antenna pointing restrictions**: The outdoor antennas of IMT base stations should generally point below the horizon, and the mechanical pointing should also be at or below the horizon. - **Sidelobe suppression technology**: For elevation angles above 30 degrees, an attenuation of 29.5 dB needs to be provided. - **Maximum Equivalent Isotropically Radiated Power (EIRP) limit**: The maximum EIRP of IMT base stations should not exceed 32 dBW/100 MHz. Through these measures, the paper aims to evaluate the potential interference impact of IMT base station deployment on SAR satellites under the above - mentioned conditions and ensure that it complies with the protection standards stipulated by the ITU - R. ### Formula summary 1. **Calculation of BS antenna gain distribution**: \[ G_{Tx}(\omega, t) \] where \(\omega\) represents the result and \(t\) represents the time instant. Assuming that the process is ergodic, the antenna gain can be described by a statistical distribution. 2. **Calculation formula for the number of IMT base stations**: \[ N_{BS\_Z1}=S_1\times BSAF\times BSNLF\times Ra_U\times D_{BS\_U} \] \[ N_{BS\_Z2}=S_2\times BSAF\times BSNLF\times Ra_{SU}\times D_{BS\_SU} \] \[ N_{BS\_Z3}=S_3\times BSAF\times BSNLF\times0.05\times(Ra_{SU}\times D_{BS\_SU}+Ra_U\times D_{BS\_U}) \] where: - \(BSAF\): BS TDD activity factor (75%) - \(BSNLF\): BS network load factor (20%) - \(S_1, S_2, S_3\): Areas of each zone (km²) - \(Ra_U\): Ratio of urban hot - spot coverage areas to urban / building areas (7%) - \(Ra_{SU}\): Ratio of suburban hot - spot coverage areas to urban / building areas (3%) - \(Rb\): Ratio of building area to total area (100% for Z1 and Z2, 5% for Z3) - \(D_{BS\_SU}\): BS density of outdoor suburban hot - spots (10 BS/km²) - \(D_{BS\_U}\): BS density of outdoor urban hot - spots (30 BS/km²) Through these studies, the paper provides an important basis for subsequent technical decisions and ensures the harmonious co - existence of the IMT system and existing radio services.