Multi-objective optimization for coordinated production and transportation in prefabricated construction with on-site lifting requirements

Jing Yin,Ran Huang,Hao Sun,Shunyao Cai
DOI: https://doi.org/10.1016/j.cie.2024.110017
IF: 7.18
2024-02-01
Computers & Industrial Engineering
Abstract:Despite numerous advantages, prefabricated construction is often perceived as less cost-effective compared to conventional cast-in-place construction. One of the main reasons for this perception is the lack of coordination among various distinct operations, such as production, transportation, and on-site assembly of prefabricated components. Therefore, this study proposes a multi-objective coordinated scheduling optimization model to efficiently manage the production, transportation, and on-site assembly of prefabricated components. Real-world demands for immediate lifting of prefabricated components at construction sites are translated into constraints for lifting sequence, delivery time, and transportation batch. An improved single-parent genetic algorithm, incorporating an initial population strategy and a self-adaptive approach for genetic operators, is designed to optimize three main objectives: the early/late delivery penalty cost, the flow time of production and transportation, and their weighted multi-objective. To validate the model's efficacy, case studies were conducted in practical construction buildings. The results demonstrate the model's effectiveness in efficiently coordinating scheduling of production and transportation in consideration of on-site lifting constraints in prefabricated construction, highlighting its practical applicability and potential for enhancing project efficiency and reducing costs.
computer science, interdisciplinary applications,engineering, industrial
What problem does this paper attempt to address?