The application of Lean Production and Six Sigma in the improvement of MRI efficiency in hospital settings

Y. Kuo,Huan-Chung Yao,Ping-Shun Chen,Pei-Jarn Chen,Ginger H. F. Shu
DOI: https://doi.org/10.1109/ICASI.2017.7988130
2017-05-01
Abstract:The number of patients undergoing magnetic resonance imaging (MRI) is on the increased. However, there are too few MRI machines, resulting in long waiting times for the patients. In order to address this problem and shorten the waiting time, this study focuses on the prospects of sharing of resources with other hospitals and increase in equipment availability. The purpose of this study is to analyze whether there are wasteful, unnecessary procedures taking up too much time during MRI studies, the elimination of which would mean improved efficiency and shortening of waiting time for the patients. We employ the Value Stream Mapping (VSM) to identify potential wasteful, unnecessary work with Lean Production and Six Sigma. We also propose a scheme to improve the process and verify its feasibility by using system simulation. We hope the results of this research can be of a positive contribution to both academic and practical hospital management.
Medicine,Engineering,Business
What problem does this paper attempt to address?