Worst-Case Load Shedding in Electric Power Networks

Fu Lin
DOI: https://doi.org/10.48550/arXiv.1712.00536
2018-10-19
Abstract:We consider the worst-case load-shedding problem in electric power networks where a number of transmission lines are to be taken out of service. The objective is to identify a pre-specified number of line outage that leads to the maximum interruption of power generation and load at the transmission level, subject to the AC power flow model, the load and generation capacity of the buses, and the phase angle limit across the transmission lines. For this nonlinear model with binary constraints, we show that all decision variables are separable except for the nonlinear power flow equations. We develop an iterative decomposition algorithm, which converts the worst-case load shedding problem into a sequence of small subproblems. We show that the subproblems are either convex problems that can be solved efficiently or nonconvex problems that have closed-form solutions. Consequently, our approach is scalable for large networks. Furthermore, we prove global convergence of our algorithm to a critical point and the objective value is guaranteed to decrease throughout the iterations. Numerical experiments with IEEE test cases demonstrate the effectiveness of the developed approach.
Optimization and Control
What problem does this paper attempt to address?