Impact of Progressive Reservoir Construction on Nonstationary Sediment Load Response to Streamflow in the Upper Yangtze River, China

Yingchun Liang,Xi Chen,Jianzhi Dong,Jiarong Wang
DOI: https://doi.org/10.1061/jhyeff.heeng-6069
IF: 2.4
2024-04-01
Journal of Hydrologic Engineering
Abstract:The progressive reservoir construction and operation have led to nonstationary sediment load response to water discharge and a new equilibrium between sediment supply and transport of a river system. However, an increase in the reservoir impoundments on the nonstationary behaviors could demonstrate significant temporal variability over the river system. In this study, the statistical relationships of annual sediment load with both streamflow and reservoir storage capacity during 1956–2018 are analyzed in the Upper Yangtze River Basin (UYRB), China. The trend and abrupt detection analyses show that the significant departure of annual sediment load to annual water discharge occurs only when the cumulative storage capacity over the course of progressive impoundments reaches a critical value for the cascade reservoirs in UYRB. The critical storage capacity gradually appeared in the 1980s, 1990s, and 2000s, accounting for the sharp increases of small- and medium-sized reservoirs in the tributaries and large-sized reservoirs in the mainstem. Once the critical storage is exceeded, the capacity to trap sediment increases exponentially with the cumulative storage. The significant increase of trapped sediment (e.g., 26%–88% of the free-flow capacity in the tributary and mainstem stations) has led to the shift of sediment-controlling factors from water discharge to the impounded runoff index. The significant reduction of sediment transportation and the altered dominant factors of sediment load could result in the steady erosion of channels and coastlines and adversely impact ecosystems in the downstream Yangtze River.
environmental sciences,engineering, civil,water resources
What problem does this paper attempt to address?