Linear-time approximation schemes for planar minimum three-edge connected and three-vertex connected spanning subgraphs

Baigong Zheng
DOI: https://doi.org/10.48550/arXiv.1701.08315
2017-01-29
Abstract:We present the first polynomial-time approximation schemes, i.e., (1 + {\epsilon})-approximation algorithm for any constant {\epsilon} > 0, for the minimum three-edge connected spanning subgraph problem and the minimum three-vertex connected spanning subgraph problem in undirected planar graphs. Both the approximation schemes run in linear time.
Data Structures and Algorithms
What problem does this paper attempt to address?