AC security-constrained transmission network expansion planning problem using an improved binary particle swarm optimization

Josué Isaí García-Mercado,Guillermo Gutiérrez-Alcaraz,N. Gonzalez-Cabrera,Victor H. Hinojosa
DOI: https://doi.org/10.1016/j.epsr.2024.111297
IF: 3.818
2024-12-09
Electric Power Systems Research
Abstract:Traditionally, linearized AC approximation is considered for network representation, which fails to offer an operational solution to cope with the reactive power problem in the planning stage. The lack of consideration of voltage and reactive power affects the implementation of the transmission network investment plan. This paper uses an improved Binary Particle Swarm algorithm to solve the multi-stage Security-Constrained Transmission Network Expansion Planning problem based on the AC power flow problem. The Reactive Power Planning stage uses a load shedding formulation by considering all load buses as candidate locations for installing additional reactive power devices. Different intelligent logical and operational strategies are developed to reduce the computational burden of the optimization algorithm by eliminating AC-infeasible solutions. The proposed approach is validated with numerical simulations applied to the classic Garver's system, and its effectiveness is corroborated using the IEEE RTS 24- and 118-bus system for a 10-year planning horizon, respectively. Also, simulation results are compared with other metaheuristic techniques reported in the literature.
engineering, electrical & electronic
What problem does this paper attempt to address?