Balancing parallel assembly lines with disabled workers

Felipe F. B. Araújo,Alysson M. Costa,Cristóbal Miralles
DOI: https://doi.org/10.48550/arXiv.1304.1423
2014-11-27
Abstract:We study an assembly line balancing problem that occurs in sheltered worker centers for the disabled, where workers with very different characteristics are present. We are interested in the situation in which parallel assembly lines are allowed and name the resulting problem as parallel assembly line worker assignment and balancing problem. We present a linear mixed-integer formulation and a four-stage heuristic algorithm. Computational results with a large set of instances recently proposed in the literature show the advantages of allowing alternative line layouts.
Discrete Mathematics
What problem does this paper attempt to address?