Complex salt rock underground and water dissolution joint cavity construction method

姜德义,陈结,杨春和,屈丹安,任松
2012-09-24
Abstract:The invention discloses a complex salt rock underground and water dissolution joint cavity construction method. The method comprises the following steps of: 1) selecting a site for a rock salt deposit; 2) enabling a water dissolution drilled well to drill through a target rock salt layer; 3) arranging an underground vertical shaft at the center of a regular hexagon; 4) excavating in the underground vertical shaft till the bottom of the target rock salt layer; 5) excavating a communicating laneway to the bottom of the water dissolution drilled well; 6) constructing a groove in the rock salt layer at the bottom of the water dissolution drilled well; 7) cutting off rock salt and transporting to the ground; 8) mounting a sealing valve at the vertical shaft end of the communicating laneway after the end of groove construction; 9) closing the valve and continuously constructing a cavern in rock salt; 10) opening the sealing valve of the communicating laneway and discharging insoluble matters at the bottom of the cavern in rock salt to the bottom of the vertical shaft; 11) discharging the insoluble matters to the ground surface; and 12) sealing the communicating laneway after the end of construction of the cavern in rock salt. According to the method disclosed by the invention, the problem that the groove construction is difficult to perform in the rock salt with high content of the insoluble matters by water dissolution-process cavity construction can be solved; by adopting the method, the usable volume of a cavity can be improved by above 90% under the same geological conditions; and the overall economy is higher than that of a pure water dissolution cavity construction method.
Engineering,Environmental Science,Geology
What problem does this paper attempt to address?