Main Problems in Engineering Geology and Alignment in Dali-Baoshan Section of Dali-Ruili Railway

Jia Liang-wen
Abstract:Research purposes:The Dali-Ruili railway under construction lies in the Hengduanshan area where the Nu River,Lancang River and Jinsha River flow with extremely complicated terrain and geological conditions.This paper summarizes the alignment technology for the Dali-Baoshan section of Dali-Ruili Railway in Hengduanshan area for providing the reference to the similar railway construction in terrain and engineering geological conditions,such as Yunnan-Tibet Railway and Sichuan-Tibet Railway,etc,planned in national railway network.Research conclusions:The Dali-Baoshan section of Dali-Ruili Railway is nearby the colliding suture zone of the Indian plate with the Eurasian Plate.As the terrain and geological conditions in this area are extremely complicated,the railway track is much affected by the geological disasters,such as active fault,seismic hazards,collapse,landslides,debris flow and high-temperature hot water.Based on learning the experiences of alignment in the southwest mountainous area with vale cut sharp and active fault,the technical principles of alignment in Dali-Baoshan section are presented,and the north route scheme with better geological conditions is selected with the railway crossing the Lancang River through the Jihongqiao Bridge.
Geology,Engineering
What problem does this paper attempt to address?