Interaction analysis of subway construction and groundwater seepage in spring area using PD-FVM coupling method

Zongqing Zhou,Daosheng Zhang,Chenglu Gao,Zhuohui Li,Xu Guo,Chengshun Shang,Penghui Wang
DOI: https://doi.org/10.1007/s40571-024-00874-0
2024-12-06
Computational Particle Mechanics
Abstract:The impact of subway tunnel construction on the surrounding strata and hydrogeological environment presents a multifaceted challenge. Jinan is characterized by numerous springs and rich karst groundwater resources, contributing to an exceptionally intricate urban groundwater system. This study establishes an efficient computational framework combining peridynamics (PD) and the finite volume method (FVM) to simulate the excavation of engineering-scale subway tunnels under fluid–solid coupling conditions. The modeling and analysis process of the PD-FVM coupling method is demonstrated using the Jinan Metro as a case study. Considering factors such as groundwater levels, tunnel buried depths, and geological conditions (presence of fractures), 20 sets of numerical simulation cases are designed. Engineering-scale simulations of groundwater seepage and the evolution of surrounding rock damage and deformation during subway construction in the spring area are conducted. The study culminates in an analysis of the interaction between subway construction and groundwater seepage, providing essential theoretical support for rail transit route design and the safety of tunnel engineering projects.
mechanics,mathematics, interdisciplinary applications
What problem does this paper attempt to address?