Proactive scheduling for steel plants with unrelated parallel machines and time uncertainty

Xiaoyuan Lian,Zhong Zheng,Mingmei Zhu,Xiaoqiang Gao
DOI: https://doi.org/10.1016/j.cie.2024.109890
IF: 7.18
2024-01-09
Computers & Industrial Engineering
Abstract:This paper deals with the steel plant proactive scheduling problem with unrelated parallel machines and time uncertainty to enhance the rationality of machine assignment and processing path and improve the schedule robustness and guarantee capability of energy. First, a scheduling model is formulated with the objectives of average process time, matching degree and oxygen consumption fluctuation. Then, an improved preference-based NSGA-II is designed to solve the problem. The algorithm introduces the preference information into the optimization process and designs an individual sorting method based on the technique for order preference by similarity to ideal solution (TOPSIS) to guide the evolution direction. Besides, to improve the local search ability, variable neighborhood search is incorporated to generate new solutions with high quality. Computational experiments prove that the algorithm can effectively address the proactive scheduling problem. The sensitivity analysis and results of different scheduling models verify the robustness and superiority in machine matching and energy synergy of the model.
computer science, interdisciplinary applications,engineering, industrial
What problem does this paper attempt to address?