Evaluation of Semi-permanent Canal Partition Design with Overflow in Aceh Province

Poppy Wiharja -,Riza Murti Subekti -,Eka Jatnika Arifin -
DOI: https://doi.org/10.36948/ijfmr.2024.v06i04.23970
2024-07-05
International Journal For Multidisciplinary Research
Abstract:Canal blocking is a form of rewetting infrastructure that functions to improve water management in secondary or tertiary channels in damaged peatlands. In 2022, the Ministry of Environment and Forestry has built 17 canal blocking units spread across 3 districts, namely Aceh Jaya district, West Aceh district and Nagan Raya district. The canal block that was built was a simple or semi-permanent canal block construction made of wood. Canal blocking must be monitored and maintained every year. This research aims to evaluate the condition, function and impact of discussion through the construction of canal blocking. This research method is quantitative and qualitative in nature to analyze and evaluate: (1) the quality of the structure and (2) the function or performance of the canal block and (3) the wetting impact of the construction of the canal block. The condition of the 17 canal blocking units that have been built are still in good condition or slightly damaged taking into account the structural quality and function or performance of the canal blocking. The condition of the canal blocking is around 85-92% or has a damage percentage of around 5-10% for each canal blocking unit. The recommendations given are preventative maintenance including maintenance of the canal cerucuk and bulkhead boards, addition of mineral soil on both sides of the wings and maintenance of runoff. The wetting impact area obtained from calculations is around 5-10 hectares for each canal block that is built.
What problem does this paper attempt to address?