Multiparameter Bidding System—Innovation in Contract Administration

Zohar Herbsman,Ralph Ellis
DOI: https://doi.org/10.1061/(asce)0733-9364(1992)118:1(142)
1992-03-01
Journal of Construction Engineering and Management
Abstract:The vast majority of construction contracts are procured using the lowbid system. In the low bid system price is the sole basis for determining the successful bidder. This traditional approach has certain drawbacks. In recent years, several innovative modifications to the low bid system have been tried. This paper presents the results of these trials and proposes a more comprehensive approach to bid award criteria. A presentation of a multiparameter bidding system is made. The multiparameter bid award system would include various ownerselected parameters, such as cost, time, and quality. Quantification of these parameters and bidder evaluation methodology are included. Finally, a discussion of the advantages and disadvantages of a multiparameter bid award criteria system is also presented.
construction & building technology,engineering, civil, industrial
What problem does this paper attempt to address?