Abstract:Abstract Every year, extreme rainfall events cause human deaths and economic losses around the world. Risk reduction strategies may involve the implementation of structural measures that are widely extended and financial relevant. Despite the high reliance on these mitigation measures, there might occur instances of overload, i.e. events with intensities exceeding the design value of these structures, that may have catastrophic consequences. In this framework, it is crucial to improve hydraulic works management, thus, we introduce a procedure at rain gauge scale for revising design variables throughout their operational lifespan. This enables us to enhance the assessment of the probability of failure of these works. Finally, we investigate instances where design variables experience overload during the recording period, thus assessing the occurrence of rare yet possible events. To this aim we find the most-suitable probability distribution to describe daily rainfall maxima in Italy. Specifically, we test the performance of four widely used bi-parametrical distributions with different tail behaviour, by analysing an impressive dataset consisting of 2282 rain gauges observations from 1860 to 2022. Our results show that: (1) 78% of the empirical samples exhibits heavy-tail behaviour; (2) when the update procedure is applied, 64% of the samples shows a higher-than-expected probability of failure; (3) at least one case of overload associated to a 100-years return period is recorded in almost all regions. Based on our results, existing hydraulic works designed to safeguard populations and their activities from catastrophic events may face a higher risk of failure than initially expected.
water resources,engineering, civil
What problem does this paper attempt to address?
### Problems the Paper Attempts to Solve This paper aims to explore the occurrence of extreme rainfall events within Italy and propose whether there is a need to update the design failure probability of existing hydraulic structures. Specifically, the study attempts to address the following points: 1. **Improvement of Hydraulic Structure Management**: By introducing a program based on rain gauge scale, the design variables are revised during their operational life, thereby improving the assessment of the failure probability of these structures. 2. **Analysis of Rare but Possible Events**: The study investigates whether the design variables experienced overload events during the recording period, i.e., events where the intensity exceeded the design values of these structures, potentially leading to catastrophic consequences. 3. **Selection of the Most Suitable Probability Distribution**: By analyzing a large dataset containing 2282 rain gauge observations (from 1860 to 2022), the study aims to find the most suitable probability distribution to describe the daily maximum rainfall in Italy. ### Main Findings 1. **78% of Samples Exhibit Heavy-Tail Behavior**: Most samples are best described by heavy-tail distributions such as Fréchet and Lognormal distributions. 2. **Importance of Updating Design Variables**: When the updating program is applied, 64% of the samples show a higher failure probability than expected. 3. **Almost All Regions Recorded at Least One 100-Year Overload Event**: This indicates that existing hydraulic structures may face a higher failure risk in protecting populations and activities from catastrophic events than initially anticipated. ### Conclusion Based on the study results, existing hydraulic structures may face a higher failure risk than initially expected during their design. Therefore, it is crucial to regularly update the design variables to control the failure probability and to develop risk-based management and intervention plans.