Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju

Jeong-Ho Hong,Dong Wook Lee
DOI: https://doi.org/10.12652/ksce.2014.34.2.0667
2014-01-01
Journal of the Korean Society of Civil Engineers
Abstract:This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.
What problem does this paper attempt to address?