Optimal Model and Algorithm Design for the Multi-Equipment Resource Collaborative Scheduling of Automated Terminals Considering the Mixing Process

Liangyong Chu,Dong Liang,Yupei Zhou,Jiawen Zhang
DOI: https://doi.org/10.1007/s11804-024-00412-7
2024-05-25
Journal of Marine Science and Application
Abstract:Considering the uncertainty of the speed of horizontal transportation equipment, a cooperative scheduling model of multiple equipment resources in the automated container terminal was constructed to minimize the completion time, thus improving the loading and unloading efficiencies of automated container terminals. The proposed model integrated the two loading and unloading processes of "double-trolley quay crane + AGV + ARMG" and "single-trolley quay crane + container truck + ARMG" and then designed the simulated annealing particle swarm algorithm to solve the model. By comparing the results of the particle swarm algorithm and genetic algorithm, the algorithm designed in this paper could effectively improve the global and local space search capability of finding the optimal solution. Furthermore, the results showed that the proposed method of collaborative scheduling of multiple equipment resources in automated terminals considering hybrid processes effectively improved the loading and unloading efficiencies of automated container terminals. The findings of this study provide a reference for the improvement of loading and unloading processes as well as coordinated scheduling in automated terminals.
engineering, marine
What problem does this paper attempt to address?